Skip
Navigation

Public Service Commission:
Huntington Water Corporation Drawings for Public Service Commission


Ar1944


24th Street Pumping Station (#312)
Plan of operating floor openings for gratings-concrete filters 1922 October 25
Meter house pumping station (9-249H) n.d.
Pumping station and grounds 1904 Feb.
Plan for water works "switch" (1042H) n.d.
General plan and elevations diagram of water works system, (9-435) 1930 October 15
Layout of 24th Street pumping station showing sidewalks, fence, rr siding and roadway (9-346) 1931 April 7
Concrete Filter Piping (Account 319-8)
Detail of overflow pipe and float tubes for concrete filters (9-263H) 1922 July 27
Support for float tubes (9-257 SK) 1922 November 3
Arrangement of piping for concrete filters (9-260) 1922 July 24
Elevations of piping for concrete filters (9-261) 1922 July 24
Details of special castings for concrete filters (9-262) 1922 June 24
Assembly of hydraulic operating device concrete filters (9-288) 1922 August 26
Steel Filter Piping (Account 319-6)
Cast iron filter specials rev. 1921 July 27
Detail of wrought iron piping for filters 9 & 10 (9-176H) 1921 July 27
Plan of filter piping steel filters 9 & 10 (9-174) 1921 July 26
Butterfly valve operating device steel tub filters (9-240) 1932 February 16
Plan of piping A.W.W. & G. Co. filters 1901 November 14
Special tee for Huntington filters (923) 1901 October 25
Cast iron filter specials (1058H) 1921 July 28
Wrought iron filter piping & specials (1059H) 1906 April 26
Sections thru pipe gallery filters 9 & 10 (9-175) 1921 July 27
Piping for filters, filters 1,2,3,4 (9-417) 1932 February 4
Piping for wood tub filters 1-4 (9-410) 1922 November 2
Guyandotte Intakes (Account 312)
Proposed low service pumping station and cast iron intake pipes (9-294) 1923 September 11
Detail of wall castings for suction lines up river low service station (9-308H) 1933 December 5
Detail of 30" suction strainer for up river l.s. pumping station (9-233SK) 1923 March 13
Pumping Stations (Account 315)
Power circuits computation sheet (2 pages)
Construction diagram (9-363H) 1923 May 14
Location of mains and valve at 24th St. pump station 1931 August 27
Suction and discharge piping pumps 1 & 2 up river low service pumping station (9-338) 1923 April 5
General arrangement of Guyandotte low service pumping station (9-339) 1923 August
Misc. steel details sheet 1 up river low service pumping station (9-350) 1923 July 6
Misc. steel details sheet 1 up river low service pumping station (9-353H) 1923 July 6
Concrete floors and pump foundations up river low service pumping station (9-354) 1923 July 14
Wiring diagram for Guyandotte l.s. pumping station (9-365) 1923 August 23
Wire guards for pump pit and oil switch enclosures at pumping station (9-387SK) 1924 August 9
Ritter Hill High Service Station arrangement of 400 and 100 gpm pumps (9-397H) 1925 March 23
Structural steel & concrete for support of 8 mgd motor driven booster pump Guyandotte l.s. pumping station (9-422) 1930 September 13
Details of suction and discharge piping for 8 mgd motor driven booster pump Guyandotte l.s. pumping station (9-423H) 1930 September 13
General arrangement of 7 mgd syn. motor driven centrifugal pump with provision for future steam turb. drive 24th Street station (9-437) 1931 September 24
Structural steel supports for 7 mgd syn motor driven centrifugal pump 24th Street station (9-438) 1931 October 22
Concrete and foundation details for 7 mgd syn motor driven centrifugal pump 24th Street station (9-439) 1931 October 22
Detail of concrete pile driving point for cent. pump foundation 24th Street station (9-440SK) 1931 September 27
Building specifications
Specifications of the American Construction and Securities Company for a brick superstructure over the low service pit for the Huntington Water Corporation, 1923 August 22
Memorandum specification of the American Construction and Securities Co. for roofing and metal work required in the alteration and extension of filter house for the Huntington Water Corporation, n.d.
Specifications of the American Construction and Securities Company for a brick pump station for the Huntington Water Corporation, 1922 April 12
Piping (Account 319-2, 319-4)
Piping between sedimentation tanks, settling basin and filters (9-189) 1921 October 4
Map of greater Huntington, 1933
Steel filters (Account 319-5)
Filter tub (1056) 1906 April 4
Proposed new filters 7 & * plan of piping (1057) 1906 April 11
Foundation plan proposed new filters (1060) 1906 April 14
Filter tub (1061) 1906 April 30 rev. 1921 July 23
Details of tub filters 1-2-3 and 4 (9-415) 1929 December 9
Saddle flanged filter inlet steel filters 1 to 4 (9-416 H) 1929 December 21
Ritter Hill High Service Station (Account 312)
Foundations (9-310) 1922 November 12
Sectional views showing equipment (9-311) 1922 November 12
Roof plan and elevations (9-312) 1922 November 12
Miscellaneous steel (9-313) 1922 December 12
Rod list (9-314) 1922 December 12
Stand pipe (9-926H) (9 pages) 1922 September 16
Settling tanks (Account 319-1)
Proposed location for sedimentation tank (1036H) 1904 January 22
Settling tank #1 (1037) 1904 January 8
Sedimentation tank piping (1039H) 1904 March 30
Settling tank #2 (9-134) 1912 December 7
Foundation for settling tank #2 (9-136) 1912 December 7
Sedimentation tank #1 foundation (9-194) 1921 December 21
Sedimentation tank #2 alteration and extension (9-212) 1922 January 21
Sewer connections at sedimentation tanks (9-250) 1922 July 11
24th Street Station Intakes (Account 312)
Design for crib for intake pipe (903) 1888 June
Plan and elevation of proposed pile protection for intake pipe (904H) 1899 September 4
Tunnel and Cook wells (908H) n.d.
Plan of suction and well lines (908H) 1896 January 1
Plan and profile of intake pipes (920) 1900 September 24
Plan of intake pipes and pump well (1069) n.d.
Detail plan of intake pipes and pump well (1071) n.d.
Plan and profile of suction lines (1085) 1907 August 14
Specials for intake pipes (1086H) 1907 August 15
Strainer for suction pipe (1089H) 1907 September 5
Reinforced concrete valve chamber, tower and platform (9-179) 1921 August 12
Valve chamber platform gratings (9-182) 1921 October 15
Repairs to intake tunnel between pump pit and valve chamber (9-190H) 1921 November 4
1 1/4" gratings (9-307) n.d.
Reservoir (Account 312)
Cross sections for proposed reservoir 1888 January
20" reservoir outlet showing pipe thru embankment 1922 January 16
Reservoir (907H) 1888
Cross section of reservoir (907H) 1892 November
Proposed piping for reservoir (1040) 1904 June 20
Proposed repairs to reservoir embankment (1092) 1908 May 6
Sketch of proposed repairs to reservoir (1093) 1908 May 6
Proposed change in top of reservoir embankment (1094H) n.d.
High level reservoir 20" diameter outlet (9-178H) 1921 August 11
Up River Low Service Station (Account 312)
Pump clearance diagram intake chamber (9-317) 1922 December 19
General and detail plans (9-320) 1923 January 5
Sections C-C, D-D & E-E first lift (9-321) 1923 January 17
Sections A-A & B-B first lift (9-322) 1923 January 23
Sections F-F & J-J second lift (9-323) 1923 January 31
Sections G-G, H-H, & K-K second lift (9-324) 1923 February 3
Sections L-L, M-M, N-N & Q-Q third lift (9-325) 1923 February 6
Sections R-R, S-S, T-T & V-V fourth lift (9-326) 1923 February 9
List of reinforcing rods & bending schedule (9-327H) 1922 December 21
Map of survey of part of Jos. Peck property (9-335) n.d.
Rod list, pipe vault & stairway (9-344) 1923 May 4
Steel floor framing plans & sections (9-349) 1923 July 6
Rod list, concrete floors and pump foundation (9-355) 1923 July 16
Superstructure (9-356) 1923 July 26
Details of cast stone (9-358) 1923 August 17
Details of cornice and metal work (9-359) 1923 August 4
Detail of entrance doors (9-360) 1923 August 13
Details of exterior (9-361) 1923 July 31
Details of cast iron door sill (9-362) 1923 August 13
Detail of spiral stairway & landing (9-364) 1923 August 22
Detail of window openings for steel sash (9-374) n.d.
Layout of grounds, roadways & fencing (9-380H) 1924 April 7
Details of front entrance steps to superstructure (9-389H) 1924 November 28
Screens for west wet chamber (9-400) 1925 November 6
Telescoped davit for hoist screens for west wet chamber (9-409H) 1927 August 25
Filter Building (Account 312)
List of lumber for concrete filter building, n.d.
General plans of store house and work shop (924) 1902 April 4
Addition to filter building (1063) 1906 June 2
Operating platform for filters (1067) 1906 July 23
New concrete floor around filter tanks 1-6 (1068) 1907 February 15
Sketches of repairs to plant (1076) 1907 June 26
General arrangement of coagulant room (9-130) 1912 February 6
6'0" diam. x 150' 0" stack foundation (9-192) 1921 November 28
Foundation plans and sections concrete filters (9-251) 1922 July 21
Plan of concrete filters (9-252) 1922 August 8
Rod list for concrete filters (9-254) n.d.
Detail of steel diaphragm for concrete filters (9-255H) 1922 July 12
Detail of steel trough for concrete filters (9-256H) 1922 July 13
Foundation sections concrete filters (9-259) 1922 August 2
Platform sections and details for concrete filters (9-265) 1922 August 29
Detail of cornice and brackets superstructure over concrete filters (9-270) 1922 August 16
Elevations and sections superstructure for concrete filters (9-273) 1922 August 23
Roof plan & details superstructure for concrete filters (9-274) 1922 August 23
Details of east and west elevations superstructure for concrete filters (9-275) 1922 August 23
Details of south elevation superstructure for concrete filters (9-276) 1922 August 23
Details of cast stone trim superstructure for concrete filters (9-277) 1922 August 23
Details of steel sash and grills superstructure over concrete filters (9-278H) 1922 August 12
Detail of wrought iron grilles for superstructure over concrete filters (9-279) 1922 August 25
Details of roof trusses etc. superstructure for concrete filters (9-280) 1922 August 25
Steel detail for concrete filters (9-281) 1922 August 30
Detail of cast iron sill superstructure over concrete filters (9-282) 1922 August 28
Detail of balustrade superstructure over concrete filters (9-291H) 1922 September 9
Foundation for stand pipe Shockey's Knob (2-292H) 1922 September 27
Detail of door for south wall concrete filter building (9-293H) 1922 September 29
Detail of brick panels south elevation concrete filter building (9-298H) 1922 October 16
Present filter and coagulant building floor plan (9-299) 1922 October 25
East and west wall elevations of present filter building (9-300) 1922 October 18
Detail of windows for present filter and coagulant building (9-301) 1922 October 17
Detail of lintels for new windows present filter and coagulant house (9-302H) 1922 October 20
Window for west wall coagulant house (9-305) 1922 October 25
Concrete floor for filters 1,2,3,4 (9-419) 1932 February 10
Pumping Station (Account 312)
Sketch of pump house and grounds (911) 1899 March 14
Plan for pump and filter house (913) n.d.
Portable crib frame (928H) 1909 August 9
New ventilator over pit (1075H) 1907 June 13
Sketch showing location toilet room (9-126 S) 1911 May 26
Alterations to superstructure over pump pit (9-172) 1920 November 16
Valve chamber platform (9-181H) 1921 September 2
Foundation plan & sections (9-195) 1922 January 14
Foundation sections sheet #1 (9-196) 1922 March 28
Roof plan boiler & pump rooms (9-198) 1922 March 3
South elevation (9-199) 1921 December 9
West elevation (9-200) 1921 December 9
North elevation (9-201) 1921 December 9
East elevation (9-202) 1921 December 9
Section thru boiler room and pump room pumping station (9-203) 1921 December 9
Longitudinal section thru pump room (9-204) 1921 December 9
Steel framing plans & sections (9-205) 1921 December 19
Details of roof trusses and columns (9-206) 1921 December 19
Details of miscellaneous iron work (9-207) 1922 February 4
Exterior details high service building (9-208) 1922 February 24
Exterior details boiler house & low service building (9-209) 1922 February 24
Details of steel sash & door for pump station (9-210) 1921 December 9
Elevations of coal house and shop (9-211) 1921 December 22
Detail of steel frames for coal windows (9-213H) n.d.
Foundation sections sheet #2 (9-219) 1922 March 28
Detail of brick arches (9-220) 1922 March 21
Details of cast stone trim (9-221) 1922 March 22
Details of doors and windows (9-222) 1922 March 22
Details of cornice brackets (9-223) 1922 March 22
Detail of copper gutter & leaders (9-224) 1922 April 6
Details miscellaneous iron work sheet #2 (9-225) 1922 April 14
List of bolts (9-226) 1922 April 20
Rod list & bending schedule (9-227) 1922 April 19
Detail of cornice facia & mould (9-228) 1922 April 4
Details miscellaneous iron work sheet #3 (9-229) 1922 April 14
Plate washers, pipe sleeves & checkered plate (9-234) 1922 April 21
Condenser pit & platform gratings (9-235 H) 1922 April 24
Boiler house roof trusses (9-236) 1922 April 12
Columns bracing struts, knees and purlins (9-236) 1922 April 13
Pump house trusses (9-236) 1922 April 10
Bracing struts & purlins (9-236) 1922 April 13
Linteas (9-236) 1922 April 15
Detail of steel frames for coal windows (9-236) n.d.
Steel framing plans & sections (9-236) 1921 December 19
Details of miscellaneous iron work (9-236) 1922 February 4
Details of roof trusses and columns (9-236) 1921 December 19
Detail of bonding for face brick (9-237) 1922 April 28
Detail of brick panels (9-238) 1922 May 1
Detail of laboratory (9-240) 1922 May 6
Detail of laboratory table tops pumping station (9-241) 1922 May 10
Detail of wrought iron grills at south entrance H.S. pump room (9-290) 1922 September 3
Pump and piping (Contract 314)
Location of Mains and Valves at 24th St. pump station 1931 August 27
3 pages weights of flanged fittings, pipe
Huntington pump pit (917H)1894
General arrangement of pumping plant (919) 1887 October 26
Suction and discharge piping (1055) 1906 January 22
Triple expansion Worthington pump layout low service pit (1062) 1906 May 11
Plan for supporting pump foundation (1064) 1906 June 6
Discharge piping for Worthington pump (1066 H) 1906 June 27
C. I. plunger for Worthington (1090 H) n.d.
Priming pipe for wood pump #43 (1091 H) 1908 January 26
Water valve for wood engine #43 (1095) n.d.
Pumping station general layout (9-153) 1916 January 24
Water valve upper and lower plates R. D. Wood pump (9-187) 1922 October 23
L. P. valve spindle for R. D. Wood pump (9-191) n.d.
General floor plans boiler and pump rooms (9-197) 1922 January 20
Alteration to steam box (9-214) 1922 January 24
Layout of Lea-Courtenay 5-M centrifugal pumping unit (9-216) 1922 February 28
Section AA and suction line of Lea-Courtenay 5-M centrifugal pumping unit (9-217) 1922 March 8
Details of piping for Lea-Courtenay 5-M centrifugal pumping unit (9-218) 1922 March 17
Boiler Plant (Contract 313)
8 pages index notes on contract and 1 page costs
Sketch H.P. exhaust heater (1037) 1907 November 11
Plan showing location of new wood pump and B&W boilers (1048) 1905 September 7
Foundation plan for B&W boilers (1949) 1905 September 7
Self supporting steel stack (1050) 1905 September 15
Stack foundation (1051) 1905 September 21
Steam lines plan & elevations (9-149) 1915 November 10
Breeching (9-186) 1922 January 6
Alterations to steam lines plan & elevations (9-230) 1922 April 14
Detail of bent pipe (9-247) 1922 June 2
Arrangement of F. W. heater & B.F. pumps auxiliary exhaust, condensate return & make-up lines (9-266) 1922 July 15
Detail of field water heater foundation (9-267) 1922 July 12
Alterations to steam lines plan & elevations (9-381) 1924 May 21
Vent condenser for 1000 HP open feed water heater 24th St. H. S. Sta. (9-413) 1929 October 24
unidentified drawing marked void (9-425) n.d.
Settling Basin, B Street (Contract 319)
Concrete settling basin #1 plan & sections (9-184) 1921 September 22
Concrete settling basin #1 sections and details (9-185) 1921 September 30
Concrete settling basin #1 rod list & bending schedule (9-186) 1921 October 4
Concrete settling basin #1 miscellaneous steel (9-188) 1921 October 21
Layout of grounds and fencing settling basin #1 (9-248) 1922 June 26
Sections through concrete filters (9-253) 1922 August 5
Enclosure fencing for pipe at settling basin property (9-289) 1022 December 22
Garage (Contract 312)
Garage on 24th Street pump station grounds (9-351) 1923 June 29
Structural steel for garage on 24th Street pump station grounds (9-352) 1923 July 2
Valve locations
Barboursville
West End
Guyandotte
South Heights
Walnut Hills
2nd to 3rd Avenue
4th to 7th Avenue
Real estate map showing property owned by Huntington Water Co. 1917 January 1


Archives Collections

West Virginia Archives and History